Our Work

Selected critical infrastructure projects.

A sample of engagements from the past decade across commissioning, construction management, and advisory. Several clients are blinded at their request. The facts and outcomes are not.

Commissioning + oversight

The methodology at scale.

Active · 550 MW · Full commissioning sequence

Confidential Hyperscale Portfolio

CommissioningHyperscale

Four hyperscale campuses in Frankfurt, Paris, Phoenix, and Berlin. About 550 MW total. About 3,000 quality issues caught per campus, most of them before final testing began.

Read case

Completed · 2.0 MW · HPC + ML · Austin metro

Confidential HPC Data Center

CommissioningHPC / AICEEDA Gold

A 2 MW facility built for high-performance and AI computing, with liquid cooling and packaged generators. First CEEDA Gold certification in North America. Virtually zero water use in the Austin climate.

Read case

Active · ~260 MW · 7 buildings

Confidential Hyperscale AI Campus

CommissioningHyperscale AISafety hold

Engaged for a single power-module scope. Within seven weeks, full commissioning oversight across all seven buildings, scaling from four people to fourteen. About 7,700 issues tracked, high-priority resolution cut roughly 4x.

Read case

Construction management + recovery

When a project arrives in trouble.

Completed · 3 MW · Midwest US

Confidential Spec-Build Rescue

RescueCM / Owner's RepZero stoppages

A project 1.5 years behind and $30 million over budget when we arrived. The network design had to be rebuilt from scratch. The builder and several subcontractors were replaced mid-project. Zero work stoppages. Zero safety recordables.

Read case

Strategic advisory

The work that happens before ground breaks.

Completed · $10B · 1.5 GW · Pan-India

Adani Group · Pan-India

Advisory$10B program

Benton Peret led the full strategic advisory for a $10B data center program targeting 1.5 GW across 5 to 10 Indian markets. We ran the joint venture tender. It closed with EdgeConnex as partner, forming AdaniConnex.

Read case

Completed · 24 MW · Renewable microgrid

Confidential Greenfield Data Center

AdvisoryDesign + BoD$7M+ identified

An investor-grade decision package for a renewable-powered greenfield site: feasibility, conceptual design, and a full basis of design in six weeks. A consolidated power architecture identified $6.5M to $8.5M in capital savings.

Read case

More

More work

We are adding cases as clients clear them for publication. If you want to see work relevant to your sector, scale, or geography, ask directly and we will show you what is most applicable.